by Emir Dupovac | Jul 5, 2025
Scope of work Located in Miami Beach’s South Beach area, this beautiful condominium project involved Southern Vertical and Thornton Tomasetti engineers. Our team addressed the building needs, including the installation of a 20,000 SF waterproofing system for the...
by Emir Dupovac | Jul 5, 2025
Scope of work This luxury building, situated in the heart of Miami-Dade, With the Southern Vertical’s expertise we perform several facade probes and PT cable repairs, in conjunction with Falcon Engineering’s specifications. Due to the building’s height...
by Emir Dupovac | Jul 5, 2025
Scope of work Terrace concrete slab repairs Balcony traffic coating system Stucco repairs Window and door sealant...
by Emir Dupovac | Jul 5, 2025
Scope of work Located in the heart of Coconut Grove, this luxury condominium required attention to terrace 2702, which experienced underlayment material bleeding that caused staining in the units below. We removed the existing tile and mortar bed down to the concrete...
by Emir Dupovac | Jul 5, 2025
Scope of work An iconic hotel located in the southernmost city of the U.S., We coordinated closely with hotel management to minimize disruptions to guests during construction. Our work included the application of a 6,000 SF traffic coating system in designated areas....